Optimization Research of Air Decking Charge Structure for Bench Blasting based on JKSimBlast



LI Zhang-chao ,XU Shuai ,LI Jin-ping ,JI Xu-bo




Abstract


Abstract: Since continuous charge structure is adopted in the bench blasting of Heigou open-pit mining area,the boulder yield is high and the secondary crushing workload is large,which seriously affects the operation efficiency of the mine''s subsequent production and loading shovel loading process. In order to optimize the open-pit blasting charge structure,the 2DBench module for open-pit mining in the blasting simulation software JKSimBlast is used. Taking the length and the position of the commonly used air decking as the research objects and the boulder yield as the evaluation index,25 groups of experiments with two factors and five levels are designed with the hole depth of 17. 5 m and the charge length of 10 m. The simulation results show that with the same air deck length,the boulder yield decreases first and then increases with the deck position moving down,and thus there is an optimal deck position. With the same deck position,the boulder yield decreases first and then increases with the increase of the air deck length. Furthermore,the optimal air deck length is determined as 2 m and the optimal deck position is 11. 5 m from the orifice. Finally,field industrial tests with the optimized structure are carried out in 5 different blasting areas. The blasting muck pile photos before and after optimization in area 3 is selected as the reference group. By comparison, the results show that the optimized charge structure reduces the boulder yield by an average of 9. 24% and effectively improves the blasting effect,which provides a useful reference for the selection and optimization of the charge structure in open pit mines.



Key words: open blasting; JKSimBlast; optimization of charging parameters; boulder yield





Chinese Information


标题: 基于 JKSimBlast 的露天台阶爆破空气间隔装药结构优化研究



作者: 李章超 ,徐 帅 ,李金平 ,纪旭波



摘要: 黑沟矿区露天台阶爆破采用连续装药结构,爆破后大块率高,二次破碎工作量大,严重影响矿山后 续铲装作业效率。基于爆破模拟软件 JKSimBlast 中露天开采 2DBench 模块,开展露天爆破装药结构优化研 究。选择常用空气间隔器作为间隔材料,保持炮孔深度 17. 5 m 和装药长度 10 m 不变,以空气间隔器长度、 中间间隔位置为研究对象,以大块率为评价指标,设计两因素五水平共计 25 组全因素组合实验。模拟结果 表明空气间隔长度相同时随着间隔位置下移,爆破大块率先减小后又增大,存在一个最佳间隔位置。间隔位 置相同时随间隔长度增大大块率先减小后增大,进而确定最佳间隔长度 2 m 与最佳间隔位置距离孔口 11. 5 m。最后,基于优化结构在 5 个不同爆破区域开展现场工业试验,选取区域 3 优化前后爆堆照片作为参 考组,利用 Split-Desktop 爆破分析软件进行数据处理,得到 5 个区域优化前后大块率并进行比对,结果显示 优化后的装药结构爆破后大块率平均降低 9. 24%,优化后的间隔装药结构有效改善爆破效果,为露天矿装 药结构选择和优化提供有益借鉴。



关键词: 台阶爆破; JKSimBlast; 装药结构优化; 大块率



Journal Integrated Operation and Management Platform with Network JMPN-2.0
Journal Integrated Operation and Management Platform with Network

《Blasting 》editorial department
Copyright © 2009   System Management   Chinese
Statistical information:total visitors Online0
putting on ICP record: E-ICP Prepared No. 05003336-9